In the spirit of Cooperativism, SORECO II joins PHILRECA, NEA and other Electric Cooperatives in facilitating the immediate power restoration in the areas ravaged by Super Typhoon Rolly and Typhoons Quinta and Ulysses. SORECO II Task Force Kapatid were deployed November 17, 2020 at about 9:20 in the morning to assist in the power restoration of distribution lines and facilities of CASURECO 1 affected by typhoons. With the General Manager’s approval, TSD Manager Engr. Bobeth M. Dellosa and ISD Manager Rochelle E. Tan selected these eight (8) linemen personnel of SORECO II to compose the “PRDD Task Force”, an initiative of the One EC Network Foundation in cooperation with PHILRECA, APEC, Ako PaDayon Pilipino and Recoboda party-lists. The team equipped with one (1) boom truck/ manlift, electrical materials, safety tools, personal protective equipment, food allowances, supplements and an Antigen negative result will be extending help to CASURECO 1 power restoration for at least fifteen (15) days. A briefing on safety and other protocols was also conducted by Safety Officer Dante Encinas, spearheaded by GM Engr. Josef Erwin R. Tabuena and BOD President Engr. Dominador E. Escoto, Jr. on November 16 to ensure that safety practices will be integrated into the team’s daily operations.